Playfords - Fibre Optic Cable Installation |
£0.00 ex VAT |
Price last updated: Tuesday, 23 July 2019 09:30 Important: All prices were correct at the time of publication and are subject to change. NYES Digital check each item price before an order is placed with our suppliers. Our suppliers change their prices without notification and some increases may occur between the order being placed by you, and the order being placed by NYES Digital. NYES Digital will notify you of all price increases over 1% of the total order. |
|
Schools ICT will coordinate the installation of your Fibre Optic Cable through North Yorkshire County Council approved contractors. Please contact Schools ICT sales on 0844 875 7428 option 2 to arrange your installation. | |
View Full-Size Image |
|
Images displayed on this website are for illustration purposes only | |
Schools ICT will coordinate the installation of your Fibre Optic Cable through North Yorkshire County Council approved contractors. The installation work will consist of: Site survey Scope of work and Quote creation Scheduling of the installation work Completion of installation work Confirmation of the installation work and supplier feedback On going support
Site Survey Schools ICT Sales will request a site survey by the contractor, giving the contractor the information gathered during your initial request. The survey date will be emailed to you via the admin@ email address, unless an alternate email address is specified.
Scope of work and Quote The scope of work contains the entire task(s) required to complete the installation. The scope of work will contain any additional requests from you; these many have been made during the initial contact or during the site. The scope of work will require authorising before work commences on site, any work not detailed on the scope of work will not be completed. The quote will be based on the scope of work, changes to the scope of work directly impact on the quoted price. Schools ICT would advise that all additional work should be added to the scope of work through Schools ICT sales.
Scheduling of the installation After receiving an authorisation to work from you Schools ICT sales will arrange an installation for the first available date, unless a pre arrange installation is required, Schools ICT will endeavour to secure the required date.
Completing the authorisation to work Reviewing the asbestos register Confirming the location of the Fibre Optic Cable
Completing the installation work During the installation of the Fibre Optic Cable area will need to free of people and furniture for the duration of the installation work.
Support The work carried out is covered for 10 Years, this includes the cables, facia and fixings if you have any issues arising from the installation please contact Schools ICT customer services on 0845 330 2922 option 1, or via email at schoolsict@northyorks.gov.uk.
Scope of work Complete and authorization to work form Check the asbestos register Confirm the proposed location for the Fibre Optic Cable Advise the site contact of the disruption Install the fibre patch panel in to the network cabinet Installation the fibre – Ethernet convertor in to the existing School LAN Install the catinery wire or cable tray between the 2 points (if specified) Install the fibre optic cable across the catinery wire or cable tray (if specified) Terminate the fibre cable at both points Test and demonstrate the fibre optic cable
This installation does not contain any CAT5e or CAT6 network point installation.
This scope of work should be used in conjunction with the CAT5 or CAT6 network point installation and a network cabinet installation. |
|
Ask a question about this product | |
Upgrades and Options: |
|
|
|
NYES Digital Information |